1987 Erie Strayer Central Mix Batch Plant From FESCO Direct
Plant is set up to switch back and forth between central mix and transit mix. There are six aggregate bins at 54 cu. yds. ea., four cements totaling 325 tons. There are two x 200 ton agg feed hoppers (normally loaded from barges) with 36" conveyor to feed agg bins. There has been a total of approx 650,000 tons through plant since new. Drum and Trelleborg bolted rubber liners are in good shape. There is a new Euro drive Motor for the drum. Complete new aggregate bin assembly is on the ground and uninstalled. New aggregate batcher uninstalled. 15,000# cement batcher, 650 gal water batcher
Setup for Central Mix or Transit Mix Batching